about us

CHIKO Solar designs and manufactures high quality solar mounting systems for pitched roof......learn more>>

Industry

About solar mounting structure Installation

Data:2019-10-22

Solar power generation is getting more and more attention. Recently, people often call to consult the specific steps of PV system installation. As a world-leading solar mounting structure manufacturer, Chiko Solar has compiled many years of production experience. The following 8 points of home distributed solar system installation for your reference.

About solar mounting structure Installation
 
1.Pre-installation consultation
Find relevant information about solar power generation and find reliable service providers.
(1) Understand the advantages and disadvantages of solar power generation, such as advantages: solar energy does not use fuel, operating costs are very low, and distributed enjoyment of state subsidies. The disadvantage is that the initial investment is high due to the need for solar equipment in the early stage.
(2) Other requirements such as the electricity demand of the home solar power generation system, the installation orientation of the solar mounting structure, the function introduction of the components, the performance test, etc. need to be clearly understood.
 
2.Surveying environmental conditions
The staff of the general company will send people to come to the site to inspect the house and the surrounding environment. It is necessary for the construction party to inspect the installation site. For example, the family solar power generation project has requirements for the roof area. If the resident is living in a villa or a rural area, If you build a house, you can meet this condition. At that time, you only need to issue a certificate that the residential property is allowed to be installed. If it is not, you cannot install it.
 
3,The solution design
The construction party is required to provide a report on the design of the household solar solar power generation system. Every household's electricity demand is not the same, the roof is blue
Bao, especially for the installation of solar mounting structures, is the most important, so the installation design needs to complete the design according to the site inspection.
 
4. Signing a contract
After the program expert handed over the plan, the customer can sign the contract.
 
5, on-grid declaration
This process requires the owner to wait patiently, of course, the tedious work has been done by us.
 
Chiko Solar said that the solar mounting structure system installed those things!
 
7, Adjust and confirm
The relevant solar power station will be inspected by the relevant personnel of the power supply bureau, and the whole solar panel support system will be inspected to meet the national standards and the strength of the bracket, and the meter will be installed, and the grid connection agreement will be signed. The whole process will be assisted by us.
 
8, After sales service
The life of a typical PV module is about 25 years. In order to better extend the service life of the component, it is necessary to regularly remove the acid, such as bird droppings and leaves on the solar glass panel. In addition, the PV modules are modular and closed, generally do not require maintenance, and non-human damage service providers are responsible for free replacement during the warranty period.
 
The PV knowledge:
Required materials in the PV project:
1. The landlord's land certificate, the copy of the account book and personal identification card, and the copy of the front and back of the bank card used by the clearing house (requires the user to sign and indicate the bank and branch of the user)
2, the original copy of the project manager's ID card, the original copy of the project owner's power of attorney
3, according to the nature of the house and the roof, provide a, private property certificate. b. Single-family building (villa) real estate license, complete property permit. C. Apartment-style housing real estate license, property start permit, owner's committee or resident committee or other owners of the same building agree.
4 In response to the resident user's monthly electricity bill or check ticket (printed by the user or printed in the business hall); the name of the project owner, the owner of the house on the real estate license or its co-owner, the name of the bank card used by Jiang and the corresponding resident user The name must be consistent with the materials required for the PV project application
1. A copy of the land certificate, real estate certificate, account book and personal ID card of the project owner, and a copy of the front and back of the bank card used by the clearing house (requires the user to sign and indicate the bank and branch of the user)
2, the original copy of the project manager's ID card, the original copy of the project owner's power of attorney 3, according to the nature of the house and the roof, provide a, private
deed
C. Apartment-style housing certificate, property start permit, owner's committee or resident committee or other owners of the same building.
4, the corresponding resident user monthly electricity tariff invoice or check ticket (user provided or business hall printing) note; project owner name, real estate certificate on the house
The name of the bank card account used by the owner or its co-owner and the corresponding resident user name must be the same.

Chiko solar more efficient and flexible solar mounting system solution waiting for you here!  Contact Us !
Chiko solar
Above news from CHIKO Sales & Marketing department
Add: No 680 Xingwen Rd. Jiading dist. Shanghai 201801 China
Phone: +86(21) 59972267 59973712 59973713--811
Fax : +86 (21)59972938
Email: Chiko@Chikolar.com
Website: http://www.chikolar.com