Solution of Factory roof solar photovoltaic power project

Data:2017-12-20

The use of idle factory roofs to build photovoltaic power generation can not only reduce energy consumption, but also make full use of idle resources to save energy and bring huge economic and environmental benefits to the factory.



The basic equipments of distributed photovoltaic system include solar photovoltaic cell module, solar photovoltaic bracket array support, DC conflux box, DC distribution cabinet, grid connected inverter, AC power distribution cabinet, and other power supply system monitoring devices and environmental monitoring devices. The operation mode is in the solar radiation conditions, solar panels convert solar energy photovoltaic power generation system output power, through the DC bus box concentrated into the DC power distribution cabinet, inverter grid connected inverter by alternating current supply of building its own load, excess or insufficient power to regulate through grid connection.

The factory roof photovoltaic power generation project rhino features: (1) no danger of depletion;

(2) safe and reliable, no noise, no pollution discharge, clean (no public harm);

(3) the advantages of building roofs can be used without the limitation of the distribution of resources.

(4) there is no need for fuel consumption and the erection of transmission lines to power generation and power generation;

(5) high energy quality;

(6) the construction period is short and the shelf life is long.

How many modes does the factory roof photovoltaic power consumptive has?

Distributed photovoltaic power generation electric Jiang can all use or spontaneous power over the Internet, self selected by the user, the user Jiang offered by grid electricity shortage. The upper and lower power Jiang separate settlement price, the implementation of national policies.

What information is required to apply for the application of the factory roof photovoltaic power project?

1. original identity card and original copy of legal person (or legal representative ID and copy);

2. land certificate of business license for enterprise legal person

3. pre work data of power generation project;

4. the government investment authorities agree that the project should be approved for the previous work (only the application needs to be approved, and the distributed PV does not need this item).

5 user power grid related data (only for large industrial users);

6. the contract energy management project, the public roof PV project, and the application or lease agreement of the buildings and facilities are also required.


Above news from CHIKO Sales & Marketing department