create value for customers

skypeskype

news

why us

Learn more about CHIKO commerical and residential mounting solution you can benefit

learn more

case studies

Find out which easy solution is just fit for your solar power system

about us

CHIKO Solar designs and manufactures high quality solar mounting systems for pitched roof......learn more>>

Industry

The analysis of solar pv bracket related security issues 丨Chiko solar

Data:2017-10-28

We all know that solar pv bracket is a part of solar energy can not be missing, it is not only played a supporting role bot aslo have the security protection for solar mounting system.
 
The most important thing is to let the solar mounting system to better accept the sun exposure. This explains that how we can know the importance of solar stents to solar mounting system is important!
 
So the security can not be ignored, the following we focus on his security issues.
 
1.  Solar pv bracket maintenance workers should carefully implement the inspection system to ensure that the support of the hydraulic system intact, the damage to the parts to be timely replacement, stent leakage, channeling when the timely treatment, dnot use it when it sick .
 
2. All pipelines shuld be suspended neat, not pressure, burial, squeeze, demolition.
 
3. Work surface All solar pv bracket must meet the perfect standard, otherwise the stent workers have the right to refuse to manipulate.
 
4. In the face to find damaged parts, hydraulic hose to be replaced in time, replaced the old to timely recovery, the problem can not solve the report to the squad leader, are not allowed to "disease" operation, to ensure that the stent is always in good condition.
 
5. To check the roof of the situation, found the roof broken or caving phenomenon, to be equipped with anti-Roofing material, handle and then move the pv bracket, to prevent the fall in the roof is too large caused by tents, bite and fall and so on.
 
6. Clean up the shelf, the front of the frame and the floating coal, floating gangue and other debris, or are not allowed to shift frame.
 
7. Move the shift and the staff around the issue of shift signal, shift the bottom of the frame and the front must not have any other staff has nothing to move.
 
8. There is a violation of the command of the behavior, solar pv bracket workers have the right to refuse to implement.
 
9. Solar Pv bracket panels parts, piping systems and auxiliary equipment, must meet the original design requirements, shall not be arbitrar.



CHIKO Solar designs and manufactures high quality solar mounting systems for pitched roof, flat roof and groundopen areas. Whether for small or large-scale projects, standard models or tailor-made systems, we deliver what your need.

CHIKO Solar is a leading manufacturer in solar industry. We provide design & manufacture & sales & service customers support from our head quarters in Shanghai.

We are working with companies from USA, Mexico, Germany, UK, Brazil, Korea, Thailand, Australia, South Africa,Japan etc to provide best services.

We are proud of the fact that more than 4GW solar project from worldwide used CHIKO mounting systems.


  • Above new from CHIKO Sales & Marketing department
  • Add: No 680 Xingwen Rd. Jiading dist. Shanghai 201801 China
  • Phone: +86(21) 59972267 59973712 59973713--811
  • Fax : +86 (21)59972938
  • Email: Chiko@Chikolar.com
  • Website: http://www.Chikolar.com