How many types of solar installation methods on the roof ?丨chiko solar

Data:2017-10-20

As the national policy of solar energy support, solar energy has been rapid development, pv bracket installation on roof is a very common form of solar power.In Pv industry, while promoting the integration of Pv buildings at the same time, pv bracket and building connections to become the focus of the design. So, how many types of solar installation methods on the roof? Now let the solar pv bracket manufacturer - Ciko Solar talk about several common solar installation.

  • solar bracket,solar mounting

(1) solar mounting bracket installation:
  • Will be the front and rear column of the anchor bolts placed in the construction has been completed on the basis of the anchor bolts;
  • Check the front and rear column is correct; adjust the front and rear column length direction of the center line and (concrete base axis) pillar center line coincidence, with the level or horizontal tube to adjust the level of the front and rear column, with vertical adjustment column vertical.
  • If the surface height of the pile foundation with the pad will be front and rear column pad and then tighten the anchor bolts.
  • The pad must be welded to the front and rear column bases.
  • Check the bottom flatness and diagonal error.
  • And adjust the front and rear beams to ensure that the error within the specified range,
  • Fasten the bolt with a wrench.
  •  
 (2) beam solar installation:
  • according to the design requirements of the distance, the length of the end to determine the beam position, beam bolts fastening, so horizontal and vertical, reliable connection. In order to ensure that the beam on the fixed plate of the Founder, should be ahead of the beam for the rules, the diagonal measurement adjustment to ensure that the diagonal deviation within the allowable deviation.

 (3) After the installation of the column stay, the column stay rod, fastening rod bolts to the entire bracket to maintain uniform force components.

In order to meet the existing norms of the country under the premise of the first to meet the safety of production, operation and maintenance as the premise, taking into account the needs of other relevant professional, different conditions of the pv bracket, choose a reasonable form of connection, and strive to achieve: safe and applicable , Economic, reasonable and beautiful, to meet and reflect the requirements of modern industrial civilization production, while minimizing the project cost, so that limited investment as soon as possible the formation of production capacity, access to the best economic benefits.


  • Above new from CHIKO Sales & Marketing department
  • Add: No 680 Xingwen Rd. Jiading dist. Shanghai 201801 China
  • Phone: +86(21) 59972267 59973712 59973713--811
  • Fax : +86 (21)59972938
  • Email: Chiko@Chikolar.com
  • Website: http://www.Chikolar.com